frankfort village hall graphic logo.7

Frankfort Advances Plans for New Multi-Use Paths to Boost Pedestrian Safety

Article Summary
The Frankfort Village Board has approved a $77,500 agreement with Robinson Engineering, Ltd. to design two new multi-use paths aimed at improving safety and connectivity in Main Park and along Pfeiffer Road. The project addresses resident concerns about pedestrian safety during sporting events and will connect southeastern neighborhoods to the village’s broader trail system.

Multi-Use Path Agreement Key Points:

  • The board approved a $77,500 professional services agreement with Robinson Engineering, Ltd. for the design phase.

  • One path will be built on the west side of Locust Street in Main Park, connecting the north and south parking lots.

  • A second path will run along the east side of Pfeiffer Road, from Laraway Road south to an existing path in the Stone Creek subdivision.

  • The fee covers design, topographic and property surveying, engineering plans, and bidding services.

FRANKFORT – Plans to enhance pedestrian safety and trail connectivity in Frankfort are moving forward after the Village Board on Monday approved a $77,500 contract to design two new multi-use paths.

The board authorized an agreement with Robinson Engineering, Ltd. for the design of a path within Main Park and another along a stretch of Pfeiffer Road. The projects are intended to address safety concerns and expand the village’s trail network.

Trustee Adam Borrelli, who presented the resolution, called the project “a pleasure to present.” He detailed the two locations, noting the first path will run along the west side of Locust Street in Main Park, from the north parking lot to the south parking lot. The second will be constructed on the east side of Pfeiffer Road, extending south from Laraway Road to connect with an existing path in the Stone Creek Phase I subdivision.

During board comments, Borrelli emphasized the project’s importance, calling it a “huge win.” He said the Main Park path directly responds to safety concerns raised by residents.

“Specifically during sporting events, specifically Falcons, and in the fall when it gets real busy over there… the board worked with the park district to come up with a plan to put a walking path along Locust there so that people aren’t walking in the street when they walk over to the ball fields,” Borrelli said. “I think that’s going to improve safety tremendously.”

The Pfeiffer Road path will provide a critical link for residents in the southeastern part of the village. “This is a little south extension that will then connect the neighborhood that starts at Stone Creek, but then also Lake View Estates and so forth,” Borrelli explained. “That’s going to be a huge improvement for our residents.”

The $77,500 fee to Robinson Engineering covers the initial design phase, which includes topographic surveying, property surveying, creating engineering plans and specifications, and handling bidding services. Construction costs are separate; preliminary estimates included in the agenda packet project the Main Park path could cost $180,000 and the Pfeiffer Road path could cost $375,000.

Trustee Maura Rigoni, who is employed part-time by Robinson Engineering, abstained from the vote on this item to avoid a conflict of interest. “For the record, I am not an owner, officer, or registered agent, and I do not have any financial interest in Robinson Engineering beyond my part-time employment,” Rigoni stated before abstaining.

Events

26 Aug
28 Aug
28 Aug
29 Aug
30 Aug
30 Aug 25
30 Aug
30 Aug 25

Leave a Comment





Latest News Stories

frankfort fire district graphic logo.2

Frankfort Fire District Projects $350,000 Surplus, But Faces Capital Crunch for New Engine

Article Summary: The Frankfort Fire Protection District is on track to end the fiscal year with a $350,000 operating surplus, but officials warn that purchasing a much-needed new fire engine...
frankfort fire district graphic logo.6

Frankfort Fire Trustees Approve New Collective Bargaining Agreement with Firefighters Union

Article Summary: Following a closed-door session, the Frankfort Fire Protection District Board of Trustees unanimously approved a new collective bargaining agreement with Local 4338, which represents the district's firefighters. The...
WCO-PZ-July-15

Crete Township Wins Approval for New Digital Sign at Community Center

Crete Township received approval from the Will County Planning and Zoning Commission on Tuesday for a new digital sign at its community center, a project that required a special use...
WCO-PZ-July-15

Will County Planners OK Oversized Garage Near Naperville, Overriding Staff Recommendation

The Will County Planning and Zoning Commission on Tuesday approved variances for a new oversized accessory garage in Wheatland Township, siding with a homeowner and builder over a staff recommendation...
WCO-PZ-July-15

Green Garden Landscaping Business Gains Permit Amid Strong Neighbor Support

A small landscaping and lawn maintenance business operating on a residential property in Green Garden Township received official approval Tuesday after neighbors voiced overwhelming support for the operation. The Will...
Meeting-Briefs

Meeting Briefs: Will County Planning and Zoning Commission for July 15, 2025

Frankfort Shed Relocation Approved: A homeowner on West Harvest Drive in Frankfort Township received a variance to reduce an east side-yard setback from 10 to 4 feet. The variance, sought by...
frankfort village hall graphic logo.4

Frankfort Approves ‘Whisk & Flame’ Culinary Studio, Slashes Parking Requirement for Downtown Property

An experiential culinary studio named Whisk & Flame is set to open in downtown Frankfort after the Village Board approved a series of special use permits and a significant parking...
frankfort village hall graphic logo.2

Frankfort Village Board Adopts $59.4 Million Appropriation for Fiscal Year 2026

The Frankfort Village Board has formally set its maximum legal spending limit for the upcoming fiscal year, adopting a $59,366,900 appropriation ordinance for fiscal year 2026. The measure was passed...
Data Center

Frankfort Establishes New Zoning Rules to Attract Data Centers

The Village of Frankfort has amended its zoning ordinance to create a specific use category for data centers, a move designed to regulate and attract high-tech development. The Village Board...
Currie Motors

Currie Motors Expansion Gets Approval with Site Modifications

Currie Motors on Lincoln Highway received approval from the Frankfort Village Board on Monday for a major change to its site plan, allowing for the construction of seven new parking...
frankfort village hall graphic logo.8

Frankfort Approves $134,531 Maintenance Contract for Wastewater Plant Filters

The Frankfort Village Board has approved a $134,531.17 agreement with Veolia Water Technologies, Inc. for critical preventative maintenance at the Regional Wastewater Treatment Plant. The contract is for the complete...
Meeting-Briefs

Meeting Briefs: Frankfort Village Board for July 14, 2025

'Whisk & Flame' Culinary Studio Approved: The board approved "Whisk & Flame," an experiential culinary studio, for 10-12 Elwood Street. The project includes four special use permits for entertainment, liquor sales,...
WCO-Exec-Cmte-July-10.1

County Approves School Resource Officer, Multi-Year Planning Requirements

Will County approved hiring an additional sheriff's deputy for a school resource officer position that will be fully funded by Summit Hill School District 161, while also passing new transparency...
WCO-Exec-Cmte-July-10.2

County Addresses Senior Tax Exemption Processing Error

A processing error that cost County Board member Julie Berkowicz $600 in senior tax exemptions has prompted discussions about improving verification systems for property tax breaks. Will County Chief Assessment...
Meeting-Briefs

Executive Committee Meeting July 10 Meeting Briefs

Liquor License Expansion: The county approved increasing Class C1 liquor licenses from eight to nine to accommodate Lockport Gas and Food LLC at 14747 W. 159th Street in Homer Glen....