
Crete Township Wins Approval for New Digital Sign at Community Center
Crete Township received approval from the Will County Planning and Zoning Commission on Tuesday for a new digital sign at its community center, a project that required a special use permit and two variances to move forward.
The commission voted unanimously to support the township’s plan to install an on-premise dynamic display at its facility located at 25930 S. Cottage Grove Avenue. The township plans to repurpose an existing brick sign structure, replacing the static center portion with a modern digital screen to display community announcements and event information.
The property, formerly a workshop facility for the New Hope community service agency, was acquired by the township in October 2024 to serve as a hub for residents.
“The Crete Township Community Center currently offers senior citizen activities, women’s exercise groups, and in the fall, the community center will expand to youth and family programs,” said Katie Nagy of Ancel Glink, the attorney representing the township.
Nagy also highlighted a critical public safety function for the new sign. “Crete Township and the county are actually currently discussing emergency management plans and the community center will be used as an emergency shelter,” she explained. “The dynamic display can also be utilized to share any news related to potential emergencies as well as directing residents to the community center as an emergency shelter.”
The project required three separate approvals from the commission due to its location and zoning. Because dynamic displays require special permission in residential and agricultural zones, the township needed a special use permit.
Additionally, two variances were necessary because the existing sign, built over two decades ago, does not meet current county codes. One variance allows the sign to be 219 feet from the nearest residential structure, closer than the 300-foot setback required for digital displays. The second variance permits the sign to remain at its current location 7 feet from the street right-of-way, inside the required 10-foot setback for freestanding signs.
Will County planning staff recommended approval for all three requests. In a staff report, planners noted that the closest residence is heavily screened by a dense hedge and mature trees, which would likely obscure much of the sign’s messaging. They also concluded that repurposing the existing sign would not alter the essential character of the area and would help the township manage project costs.
The county’s zoning ordinance places several restrictions on the sign’s operation, including limiting message dwell time to a minimum of 10 seconds and regulating brightness levels, particularly at night. The commission’s approval is contingent on the township adhering to all county codes for dynamic displays.
Latest News Stories

PZC Briefs: Solar Farm in Crete, Post-Fire Permit for Troy Business, and More

In Brief: Capital & IT News

Will County Finance Committee July 1 Meeting Briefs

Will County Public Works Committee Juliy 1 Meeting Briefs

New Lenox Library Board Seats New Trustees, Reorganizes After Election

New Lenox D122 Board Approves Nearly $300,000 for Summer Maintenance Projects

New Lenox Fire District to Launch Comfort Dog Program for First Responders, Community

Library’s ‘Studio’ Draws Record Crowds with New Tech and Creative Programs

D122 to Spend $24,950 on Professional Enrollment Forecast

Frankfort Library Secures $83K Grant for Reading Room, Financial Report Shows Strong Position

Frankfort Library Considers Limiting Digital Access on Educator Cards to Manage Costs

Newly Appointed Trustee Brooks Stenoish Takes Oath, Finalizing Frankfort Library Board

Meeting Summary: Frankfort Public Library District for June 26, 2025

JJC Trustees Approve Contentious FY26 Budget After Heated Debate, Failed Postponement
