New-Lenox-School-122.3

New Lenox D122 Board Approves Nearly $300,000 for Summer Maintenance Projects

Spread the love

The New Lenox School District 122 Board of Education has approved a comprehensive list of 56 maintenance and capital improvement projects to be completed over the summer, allocating a total of $299,024 for the work.

The projects, which range from district-wide carpet cleaning and fire system inspections to refinishing bathroom floors and replacing equipment, were approved as part of the consent agenda at the board’s May 20 meeting. The work will be managed internally by the district’s maintenance department and is budgeted as part of the 2025-2026 fiscal year.

According to a memo from Business Manager Robert Groos, the district’s Director of Facilities collaborates with building principals each spring to identify and prioritize projects for the board’s approval. This annual process aims to address necessary upkeep, repairs, and upgrades across all school buildings while students are on summer break.

The approved list includes several significant district-wide expenditures. The largest single item is $31,402 for carpet cleaning in all buildings, awarded to Cornelia Carpet. Other major service contracts include $20,000 for power strips, $15,000 for mulch from Dutch Barn, and a $10,264 contract with Shorewood Home & Auto for a new tractor with a plow and salt spreader.

Several schools will see targeted improvements. A major project at Bentley School involves refinishing bathroom floors and updating sinks and partitions, with an estimated cost of $35,000. Pointe/Crossing School is slated for a $6,900 VFD replacement for its HVAC system.

The district also budgeted for essential safety and maintenance inspections, including $9,500 for fire suppression and alarm systems, $4,158 for backflow certifications, and $10,574 for basketball backstop inspections.

The board approved the project list in a unanimous vote. The motion was made by Vice President David Rush and seconded by board member Bill Pender. All board members, including President Stephanie Peltzer, Nicole DeGrave, Al Haring, Fay Bowie, and Megan Wendtland, voted in favor.

The full list of projects includes numerous smaller but essential tasks, such as painting, landscaping, concrete repairs, and equipment service at various schools, ensuring facilities are prepared for the start of the 2025-2026 school year.

Leave a Comment





Latest News Stories

Meeting Briefs

Meeting Summary and Briefs: Frankfort Fire Protection District Board of Trustees for July 15, 2025

The Frankfort Fire Protection District Board of Trustees took major steps toward addressing long-term financial and operational needs at its meeting on July 15, 2025. The board directed its interim...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Square Park District for July 17, 2025

The Frankfort Square Park District Board of Commissioners on Thursday, July 17, 2025, heard positive updates on major capital projects and celebrated the national success of its BDC dance program....
frankfort fire district graphic logo.4

Frankfort Fire District Faces Tighter Budget, Rising Overtime in FY 2025 Outlook

Article Summary: A preliminary review of the Frankfort Fire Protection District's fiscal year 2025 budget indicates a smaller surplus than the previous year, driven by rising overtime costs and an...
fall-festival-b2adf834-992f-4ebd-ac09-edfc1d11b40a-circle

Your Ultimate Guide to the 2025 Frankfort Fall Fest: Everything to Know for the Nationally-Ranked Event

FRANKFORT, IL – The heart of historic downtown Frankfort is set to transform into a vibrant hub of art, music, and community spirit for the 57th annual Frankfort Fall Festival. Running...
frankfort illinois library logo graphic.1

Frankfort Library Tables Reading Room Project Over Higher-Than-Expected Engineering Costs

Article Summary: The Frankfort Public Library Board of Trustees voted to table a proposal from architectural firm StudioGC for a planned reading room project after engineering fees came in significantly...
Meeting Briefs

Meeting Summary and Briefs: Frankfort Township Board for July 14, 2025

The Frankfort Township Board on Monday, July 14, 2025, primarily focused on zoning matters, unanimously denying special use permits for two businesses, Dimitri Best Food and Kismet Restaurant, that sought...
frankfort-park-district

Frankfort Park District Board Approves Pay Raise for Executive Director Gina Hassett

Article Summary: Following a closed session, the Frankfort Park District Board of Commissioners unanimously approved a compensation increase for Executive Director Gina Hassett. The decision was made during the board's regular...
Meeting Briefs

Meeting Summary and Briefs: Summit Hill School District 161 for July 9, 2025

The Summit Hill School District 161 Board of Education took several key actions at its meeting on Wednesday, July 9, 2025, highlighted by the unanimous approval of a $115,905 contract...
frankfort-square-park-district.2

Park District’s BDC Dance Program Earns National Recognition

Article Summary: The Frankfort Square Park District’s Board of Commissioners celebrated the national success of its BDC dance program, which recently won numerous accolades, including a studio excellence award, at...
frankfort fire district graphic logo.3

Frankfort Fire District and Firefighters Union to Discuss Possible Referendum

Article Summary: The Frankfort Fire Protection District Board of Trustees has called a special meeting for July 25 to discuss a "possible referendum" with representatives from the Associated Fire Fighters of...
WCO Board Aug 21.4

After Initial Rejection and Tense Debate, Board Reconsiders and Approves Contested DuPage Township Business

Article Summary: In a rare reversal, the Will County Board approved a special use permit for a landscaping business in a residential area of DuPage Township after the measure initially...
frankfort fire district graphic logo.3

Frankfort Fire Board Approves $460,000 Purchase of New Cardiac Monitors

Article Summary: The Frankfort Fire Protection District Board of Trustees unanimously approved a five-year, $459,775 agreement to acquire six new, state-of-the-art cardiac monitors. The purchase replaces aging equipment that is...
Frankfort-Township-Logo-Graphic

Frankfort Township Highway Department Upgrades Aging Fleet, Starts Grant Project

Article Summary: The Frankfort Township Highway Department is in the process of replacing equipment that is up to two decades old, having recently received a new small leaf vacuum and a...
summit-hill-junior-high-school-frankfort-161

Summit Hill 161 Board Split on Administrative Assignments, Contracts

Article Summary: The Summit Hill District 161 Board of Education showed rare division in two separate 6-1 votes to approve administrative assignments and contracts for the upcoming school year. Board member...
Meeting Briefs

Meeting Summary and Briefs: Will County Board for August 21, 2025

The Will County Board received County Executive Jennifer Bertino-Tarrant’s proposed $791 million budget for fiscal year 2026, which holds the line on the property tax levy while funding key services....