Screenshot 2026-05-09 at 4.13.15 PM

Frankfort Village Board Greenlights Dutch Bros Coffee Drive-Through on LaGrange Road

Spread the love

Frankfort Village Board Meeting | April 20, 2026

Article Summary: The Village Board approved a series of Special Use Permits and a Major Change to a Planned Unit Development to allow the construction of a new Dutch Bros Coffee location, featuring a drive-through and walk-up window, in the Frankfort Crossing shopping center.

Dutch Bros Coffee Key Points:

  • The 1,264-square-foot coffee shop will be built on the final vacant lot (Lot 1) in the Market Street West Retail Development, just north of Potbelly.

  • The Board approved extended operating hours, allowing the business to open at 5:00 a.m. to accommodate early commuters.

  • The site plan provides 29 parking spaces, exceeding the 13 required by code, and features a dual-lane drive-through capable of stacking up to 17 vehicles, with an overflow plan to handle up to 37 cars.

  • Final construction is contingent upon written approval from Potbelly regarding shared access easement modifications.

The Frankfort Village Board on Monday, April 20, 2026, paved the way for a new coffee option in town, unanimously approving a Major Change to a Planned Unit Development (PUD) and three Special Use Permits for a Dutch Bros Coffee location at 20900 S. LaGrange Road.

The new ±1,264-square-foot establishment will occupy Lot 1 of the Buona Frankfort Subdivision, serving as the final piece of the Market Street West Retail Development. Dutch Bros Coffee operates primarily as a drive-through and walk-up model without interior customer seating.

To accommodate this unique business model, the Board passed Ordinance No. 3559 to approve the PUD Major Change and Ordinance No. 3560 to grant Special Use Permits for a carry-out restaurant, drive-up service windows, and extended hours of operation. The extended hours allow the shop to operate from 5:00 a.m. to 11:00 p.m., seven days a week.

Trustee Gene Savaria presented the item, noting the applicant requested several modifications from standard Village requirements. These included a waiver of the enclosure of operations requirement to allow for the walk-up window, permission to install a single-color wall sign on the south building wall facing Lot 2, an allowance for a second wall sign on the east building elevation, and permission to install a snap-frame menu board on the north wall. The Board also approved increasing the maximum pre-sale menu board area from 10 square feet to 10.7 square feet.

Traffic and stacking efficiency were central to the proposal’s review. The site plan boasts 29 parking spaces—well above the Village’s requirement of 13—including three dedicated spaces for mobile order pick-ups. The dual-lane drive-through is designed to stack 17 vehicles within the curb-protected area and features a 12.5-foot bypass lane for exiting customers.

According to the business narrative submitted by Eric Pedersen of Keystone Planning & Design, Dutch Bros employs “Runners” equipped with tablets to take orders in line, keeping the queue moving efficiently with an average wait time of 45 seconds. Should traffic exceed the 17-car capacity, staff will be deployed to direct an additional nine vehicles to queue along the north edge of the parking lot. In extreme peak conditions, up to 11 more vehicles can stack along the west side of the site, accommodating a total of 37 vehicles before impacting the main shared access drive to LaGrange Road. The applicant has also committed to hiring off-duty police officers to direct traffic during the opening weeks.

Aesthetically, the building’s architecture was designed to harmonize with the existing PUD. Following feedback from the Plan Commission, the applicant agreed to use full-dimensional masonry, specifically Modular Brick Veneer in “Belcrest 560” and split-face stone in “Riesling,” matching the adjacent Verizon, CD One Price Cleaners, and Potbelly buildings. The applicant also agreed to maintain a gray metal cornice rather than their corporate blue, and relocated the building’s address numbers to the window glass to maintain consistency with the plaza.

Final approval remains conditioned upon the applicant obtaining written consent from the property and business owners of Potbelly (Lot 2) regarding the proposed drive-through lane and necessary access easement modifications.

Today Jun 8
Slight Chance Rain Showers then Slight Chance Showers And Thunderstorms
85° 72°

Slight Chance Rain Showers then Slight Chance Showers And Thunderstorms

💨 5 to 10 mph 💧 20%

Leave a Comment





Latest News Stories

frankfort illinois library logo graphic.1

Frankfort Library Secures $83K Grant for Reading Room, Financial Report Shows Strong Position

FRANKFORT, IL – The Frankfort Public Library is poised to begin its next major renovation after the State Library confirmed it has qualified for a matching grant of up to...
frankfort illinois library logo graphic.5

Frankfort Library Considers Limiting Digital Access on Educator Cards to Manage Costs

FRANKFORT, IL – The Frankfort Public Library is exploring a change to its digital lending policies for local educators to manage the rising costs and high demand for popular streaming...
frankfort illinois library logo graphic.1

Newly Appointed Trustee Brooks Stenoish Takes Oath, Finalizing Frankfort Library Board

FRANKFORT, IL – The Frankfort Public Library District Board of Trustees is now at its full seven-member strength after newly appointed trustee Brooks Stenoish was officially sworn in at Thursday...
Meeting-Briefs

Meeting Summary: Frankfort Public Library District for June 26, 2025

The Frankfort Public Library District Board of Trustees held its regular monthly meeting on Thursday. The board swore in its newest member, reviewed a strong year-end financial report, and approved...
JJC-Graphic-Logo

JJC Trustees Approve Contentious FY26 Budget After Heated Debate, Failed Postponement

The Joliet Junior College Board of Trustees on Wednesday approved a $322.3 million budget for fiscal year 2026, but not before a tense debate that saw a motion to postpone...
Screenshot-2025-07-06-at-9.50.39-AM

Lincoln Way District 210 Approves $2.1 Million Budget Amendment, Maintains Strong Financial Position

Lincoln Way Community High School District 210 board members unanimously approved an amended fiscal year 2025 budget Thursday night that increases the district's operating surplus to $2.1 million while maintaining...
Joliet-Junior-college.-Graphic-Logo.5

JJC’s ‘12x12x12’ Initiative Boosts College Credits, Increases Matriculation Rate

Joliet Junior College’s ambitious "12x12x12" initiative is yielding significant results, leading to more high school students earning college credits and a greater percentage of them choosing to attend JJC after...
Screenshot-2025-07-06-at-9.45.35-AM

District 210 Approves Administrative Restructuring, Staff Salary Increases

Lincoln Way Community High School District 210 board members approved administrative restructuring and salary increases for non-union clerical support staff during closed session actions Thursday night. The board unanimously approved...
Joliet-Junior-college.-Graphic-Logo.4

JJC Board Meeting Highlights Tensions Over Legal Bills, Trustee Conduct

An otherwise routine vote to approve monthly bill payments ignited a tense exchange at the Joliet Junior College Board of Trustees meeting Wednesday, revealing ongoing friction over redacted legal invoices,...
Joliet-Junior-college.-Graphic-Logo.3

Students, Trustees Emphasize Importance of Inclusivity and Flag Raisings at JJC

From a recent graduate’s public plea to trustee remarks on federal policies, the theme of student belonging and inclusivity was a prominent thread at the Joliet Junior College Board of...
Meeting-Briefs

L-W School Board June 26 Meeting Briefs

Special Education District Update: The fence installation around the playground at Lincoln Way Area Special Education District 843 has been completed except for one gate section that will allow equipment...
Joliet-Junior-college.-Graphic-Logo.2

JJC Embarks on New 10-15 Year Facilities Master Plan Process

Joliet Junior College is laying the groundwork for its physical future, officially launching a comprehensive process to create a new facilities master plan that will guide campus development for the...
Meeting-Briefs

Meeting Summary: Joliet Junior College Board of Trustees for June 25, 2025

The Joliet Junior College Board of Trustees met on Wednesday, June 25, 2025. Key actions included the approval of the fiscal year 2026 budget after a contentious debate and hearing...
frankfort illinois library logo graphic.5

Frankfort Library Board Appoints Former Trustee Brooks Stenoish to Fill Vacancy

The Frankfort Public Library District Board of Trustees on Tuesday appointed former trustee Brooks Stenoish to fill a vacant seat, bringing an experienced member back into the fold just weeks...
frankfort illinois library logo graphic.1

Meeting Summary: Frankfort Public Library District for June 17, 2025

The Frankfort Public Library District Board of Trustees held a special meeting on Tuesday, where its primary actions were to fill a board vacancy and conduct an orientation for its...